What We Do

Welcome

Welcome to Tunnel Form Construction we started as as construction and concrete contractor specializing in the fast track tunnel formwork system of construction, but over the years our skillset and experience has allowed us to expand our specialisms to near Turnkey construction. From Concept and design to fitting the front door and giving you the keys TFC can assist.

  TFC have worked as sub contractor to project management on construction projects worldwide on 5 continents from Venezuela through to Mongolia. TFC and our tunnel form system gives the developer the quickest, most economical, labour saving, time saving and systematic system of building...          simply put there is no rival system  


How? We cast concrete daily. Upto 500m2 of concreting placed every day... a minimum of 20  concrete castings a month...GUARANTEED! 

That's upto 10,000m2 of floor plan concreting monthly per contracting team! 


What does that mean in real terms? Well in 30 days we complete the concrete shell of

  

APARTMENTS- 144 apartments in a 12 floor block  

HOUSES- 50 two floor homes of 100m2-300m2  

HOTELS- rooms floors for a 240 to 360 room hotel  

SOCIAL ACCOMMODATION- 300 units of basic accommodation  

SCHOOLS- large classrooms for a 1000 pupil school  

STUDENT DORMS- A 360 room student dormitory  

BUNGALOWS- 100 single floor luxury villas of upto 100m2 each  

CONDOMINIUMS- a 60 apartment condominium complex  

LUXURY VILLAS- 20 luxury homes each upto 500m2 


If you have a land to be developed, are/or a contractor with a project, a budget, a deadline...we are waiting for your call

Concept Design and Pre Planning

This phase includes initial consultancy on designing or converting a project to tunnel form methodology using value engineering philosophy and by working closely with the design team to create your vision. A systematic planning methodology that ties in architectural, structural, MEP and tunnel form planning from outset. Site management and logistics even down to casting sequence and crane plans are established. TFC guide budgets and expenditure to ensure optimal project delivery timelines and predictably reliable units/buildings delivery. 

Pre-Construction

This phase includes constant monitoring and interaction. We keep an eye on budgets to ensure the lowest costs,  stay on top of schedules for timely delivery and work closely with the design team to create your vision.

Substructure and Infrastructure

This phase includes constant monitoring and interaction. We keep an eye on budgets to ensure the lowest costs,  stay on top of schedules for timely delivery and work closely with the design team to create your vision.

Superstructure Construction

Working to a repeated and tested daily program TFC crews deliver upto 500m2 of concrete wall and slab daily with all first fix conduits and MEP installed in slab or ready for post casting screed installation. Visible performance and accountability throughout the entire build till project completion.  From start to final casting whether 5000m2 or 500,000m2 we stay focused on the goal delivering concrete shell . 

Conventional In situ works & Precast works

Working with our experienced steel and carpentry formwork divisions, we shape concrete to complete your entire build. In situ stairs, parapets, shaft enclosures, garden walls whatever the project depicts caste at site. If its industrial formworks we call on the strength of our sister company Dema Formworks for steel projects and construction steel formwork, precast moulds, infrastructure formworks and of course the tunnel form system 

Finishing Works

First and second fix electrics and plumbing, Screeding HVAC, Dry walls and False Ceiling installation, Carpentry on Doors, Kitchens and Cabinetry fitting of kitchen units and appliances, Painting, Tiling and Floor laying of Parquet or Carpets. . If TFC do not have the manpower we have the solution partners that can complete to the fitting standard specified and above. 

Post Construction

The last step in any build. This phase includes site cleanup, systems training, final inspections and move-in coordination. After completion, we have a final walkthrough to ensure your complete satisfaction. From 10 villas in Libya through to 2860 apartments delivered in 7 months in Venezuela. TFC have the expertise to successfully deliver on time and under budget.

Copyright © 2022 TUNNEL FORM CONSTRUCTION - All Rights Reserved.


Powered ®SASCONCEPT DESIGN 2022

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept